Landmarks

Burlington, Ontario, Canada

A researched shortlist for Burlington, Ontario. Compare addresses, practical details and maps.

Key information

This is a growing shortlist. Each place has its own source and address. Read the article for comparisons and dated community opinions.

On this page

Place details and maps

Burlington Canal Lift Bridge

Eastport Drive at the Burlington Canal, Burlington, ON

The federal vertical lift bridge carrying Eastport Drive over the Burlington Canal between Lake Ontario and Hamilton Harbour. Its two towers hold the lifting machinery.

Opened
1962
Run by
Public Services and Procurement Canada
Lifts
About 4,000 a year, mid-March to late December
Crossing
Four traffic lanes, west sidewalk, bike path
Useful for
Watching freighters pass through the canal up close; walking or cycling to the beach trails
Before visiting
Lifts can stop road traffic for 30 to 60 minutes when cargo ships pass; no lifts from early January to mid-March

Sources: Public Services and Procurement Canada: Burlington Canal Lift Bridge

Map searches identify a place and address. They do not verify entrances or step-free routes.

Plan your visit

Useful questions

What is inside the boxes on top of the Burlington lift bridge towers?

Machinery that lifts the bridge: motors, gearboxes, large pulley wheels called sheaves, and the wire ropes that connect the road deck to its counterweights.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge

Who runs the Burlington Canal Lift Bridge?

The Government of Canada, through Public Services and Procurement Canada. It is a federal bridge, not a City of Burlington one.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge

Does someone sit in the top of the tower to raise the bridge?

No. People who have worked on the bridge say the operators work from a control room near road level, and the tower rooms are visited for maintenance and repairs.

Source: Burlington residents discuss what is inside the lift bridge towers, August 2026

How heavy is the lift span?

About 1,996 tonnes. Counterweights that weigh almost the same do most of the work, so the motors only need 150 horsepower per tower to drive it.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge

How high does the bridge go?

The span rises 33.5 metres, giving ships about 36.5 metres of clearance at typical water levels.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge

How often does the bridge lift?

About 4,000 times a year, for roughly 6,500 vessels, including more than 1,000 cargo ships.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge

How long will I wait when the bridge is up?

Usually 5 to 10 minutes for pleasure boats and 30 to 60 minutes for cargo ships, and longer at busy times.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge

When does the bridge stop lifting for the winter?

The navigation season runs from mid-March to late December. From early January to mid-March there are no lifts and crews do maintenance.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge

Are there really falcons living on the bridge?

Yes. Peregrine falcons have nested on the north tower since at least 2003, and a nest box was installed by a north tower window in 2007.

Source: AECOM for the Government of Canada: Burlington Canal Lift Bridge Peregrine Falcon Management Plan (2021)

How do I find out about bridge closures?

Public Services and Procurement Canada posts media advisories on Canada.ca and on its X account, @PSPC_SPAC. Boaters listen on marine radio channel 16.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge

When was the current bridge built?

It opened in 1962. It originally carried rail tracks too, which were removed in 1982 when the road was widened to four lanes.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge

Can I walk or bike across the lift bridge?

Yes. There is a sidewalk on the west side, widened to 1.5 metres in the 2024 rebuild, and the old rail alignment became a bike path.

Source: Public Services and Procurement Canada: Burlington Canal Lift Bridge deck replacement project

Get in touch
My Burlington

How can we help?